    焊接專機焊接操作時的十個要點

    來源:http://m.opedost.com/  發(fā)布時間:2022-11-03 瀏覽次數(shù):0

    焊接專機使用過程中不允許超載,否則將會因過熱而燒毀焊接專機或造成火災(zāi);超載造成絕緣損壞,還可能引起漏電而發(fā)生觸電事故。下面來講講山東焊接專機焊接操作時的十個要點。
    Overload is not allowed during the use of the special welding machine, otherwise the special welding machine will be burnt or cause fire due to overheating; Overload may cause insulation damage and electric shock due to electric leakage. Now let's talk about the ten key points in the welding operation of Shandong special welding machine.
    (1)焊接前,應(yīng)先檢查焊機設(shè)備和工具是否,如焊機接地及各接線點接觸是否良好,焊接電纜絕緣外套有無破損等。
    (1) Before welding, check whether the welding machine equipment and tools are safe, such as whether the grounding of the welding machine and the connection points are in good contact, and whether the insulating jacket of the welding cable is damaged.
    (2)在設(shè)備上進(jìn)行焊接前,應(yīng)先把設(shè)備的接地或接零線拆掉,焊接完后再恢復(fù)。
    (2) Before welding on the equipment, the grounding or neutral line of the equipment shall be removed first and then restored after welding.
    (3)進(jìn)行電焊作業(yè)前,應(yīng)檢查作業(yè)環(huán)境,危險有害因素和設(shè)置監(jiān)護(hù)人員。當(dāng)附近有其他人員和有關(guān)設(shè)施時,應(yīng)采用屏護(hù)和間隔等,保證作業(yè)。需在高處焊接作業(yè)時,須掛好帶。
    (3) Before electric welding operation, the operating environment shall be checked, hazardous and harmful factors shall be removed, and supervisors shall be arranged. When there are other personnel and relevant facilities nearby, screen and safety interval shall be adopted to ensure the safety of operation. When welding at heights is required, safety belts must be hung.
    (4)更換焊條時,焊工應(yīng)戴絕緣手套。
    (4) When replacing welding rods, welders shall wear insulating gloves.
    (5)在金屬容器內(nèi)、金屬結(jié)構(gòu)上及其他狹小工作場所焊接時,觸電的危險性大,須采取專門的防護(hù)措施。如采用墊橡皮墊,戴皮手套,穿絕緣鞋等,以保障焊工身體與焊件間絕緣。禁止使用簡易無絕緣外殼的電焊鉗。
    (5) When welding in metal containers, metal structures and other narrow workplaces, the risk of electric shock is high, and special protective measures must be taken. For example, rubber pads, leather gloves and insulating shoes are used to ensure the insulation between the welder's body and the weldment. It is prohibited to use simple welding tongs without insulating shell.
    山東焊接專機
    (6)改變焊機接頭,更換焊件需要改接二次回路時,應(yīng)選擇轉(zhuǎn)移工作地點、焊機檢修暫停工作或下班等,且須切斷電源后方可進(jìn)行操作。
    (6) When changing the welding machine joint and changing the weldment, it is necessary to change the secondary circuit, select the transfer work site, suspend the work of the welding machine maintenance or go off work, and cut off the power before operation.
    (7)焊機應(yīng)設(shè)置在防雨和通風(fēng)良好的地方。焊接現(xiàn)場不準(zhǔn)堆放易燃易爆物品。
    (7) The welding machine shall be set in a rain proof and well ventilated place. Inflammables and explosives are not allowed to be stacked on the welding site.
    (8)交流弧焊機一次側(cè)電源線須絕緣良好,不得隨地拖拉,長度應(yīng)不大于5m,進(jìn)線處須設(shè)置防護(hù)罩。
    (8) The power line at the primary side of AC arc welding machine must be well insulated, and shall not be dragged anywhere. The length shall not be more than 5m. The incoming line must be provided with a protective cover.
    (9)焊機二次接線宜采用YHS型橡皮護(hù)套、銅芯多股軟電纜,電纜的長度應(yīng)不大于30m。
    (9) YHS type rubber sheath and copper core multi strand flexible cable should be used for the secondary wiring of the welding machine, and the length of the cable should not be more than 30m.
    (10)根據(jù)施工需要,焊接專機宜按區(qū)域或標(biāo)高層集中設(shè)置,并應(yīng)編號。
    (10) According to the construction needs, the special welding machines should be set up in a centralized manner according to the area or standard high level, and should be numbered.
    此外布置在室外的焊接專機應(yīng)設(shè)置在干燥場所,并設(shè)棚遮蔽。且焊接專機的電源開關(guān)應(yīng)單獨設(shè)置,直流焊接專機的電源應(yīng)采用啟動器控制。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://m.opedost.com咨詢吧!
    In addition, the special welding machine arranged outdoors shall be set in a dry place and covered by a shed. The power switch of the special welding machine shall be set separately, and the power supply of the DC welding machine shall be controlled by the starter. More relevant content will come to our website http://m.opedost.com Consult!

    上一篇:操作自動焊接設(shè)備進(jìn)行焊接中的留意事項
    下一篇:自動焊接設(shè)備的檢查與注意事項

    伊人久久大香线蕉综合5g| 国模吧2021新入口| 亚洲国产精品无码久久久秋霞2 | 久久精品中文闷骚内射| 欧美zoozzooz在线观看| 四虎国产精品免费视| 色综合久久中文字幕无码| 国产激情视频一区二区三区| 99精品国产在热久久无码| 天堂网2018| 不卡av电影在线| 成人18免费网站在线观看| 久久亚洲欧美综合激情一区| 日本红怡院亚洲红怡院最新| 亚洲AV永久无码天堂网| 曰批免费视频播放30分钟直播| 亚洲日韩乱码中文字幕| 欧美极品videossex激情| 人人爽人人爽人人片av| 激情久久av一区av二区av三区| 北条麻妃74部作品在线观看| 精品国产一二三产品价格| 国产999精品久久久久久| 综合久久99久久99播放| 国产三级手机在线| 色噜噜狠狠色综合日日| 国产偷窥熟女精品视频| 蜜桃精品免费久久久久影院| 国产午夜精品一二区理论影院| 花蝴蝶免费版高清版| 国产一级理仑片日本| 男女做性无遮挡免费视频| 午夜性福利视频| 男男gay做爽爽视频| 免费黄网站大全| 爱情岛论坛亚洲永久入口口| 免费A级毛片无码A| 欧美超强性xxxxx| 亚洲精品一级片| 欧美寡妇XXXX黑人猛交| 亚洲最大在线观看|